Well, after a frantic time the detailed engineering design was done, and went to contractors to produce their tenders. 

Bids are required by the 30th of October. 

Montage in green

Here is a montage based on the earlier design. The colour scheme is not decided at all though. We want it to harmonise with the surroundings but it could be painted blocks, or brick, or stone cladding... how about a mural?